Bajau Indo Blog
Technical guides, case studies, regulations, and updates on the modular floating structure industry in Indonesia.
Floating Dock Maintenance: Routine and Post-Extreme-Weather Inspection Checklist
A floating dock maintenance guide: what to check on joints, moorings, decking, and railings, how to clean, and steps to take after extreme weather.
Floating Platform Frames: Aluminum or Galvanized for Your Project?
Aluminum or galvanized floating platform frame? Understand the differences in weight, seawater and freshwater durability, and maintenance before you choose.
Floating Platform Decking: Choosing WPC, Aluminium Checker Plate, or No Decking
Compare WPC, aluminium checker plate, and frame-only floating platform decking: function, weight per m², and how to choose for your project.
How to Calculate Pontoons for a Floating Platform, with an 8 × 4 Meter Example
Learn how to calculate pontoons for a floating platform: structural load, target load, and buoyancy, with an 8 × 4 m example from our configurator.
Tourist Catamaran Maintenance: A Checklist from Daily to Periodic
A maintenance checklist for tourist catamarans: daily, weekly and periodic checks, steps after extreme weather, and how to record inspection results.
Tourist Boat Service Capacity: How to Plan Schedules and Trip Rotation
How to calculate daily tourist boat service capacity from the trip cycle, build a schedule, manage queues, and protect operator rest time.
Floating Dock Installation Stages: From Pontoon Arrival to Ready for Use
Understand the floating dock installation stages in order: site preparation, assembling pontoon rows, framing, decking, railings, mooring, and the final inspection.
Modular Pontoon Delivery: Site Data, Unloading, and Storage
Plan the delivery of modular pontoons to your project site: address data, truck access, unloading hours, stacking area, temporary storage, and the assembly team's schedule.
Inspecting Pontoons on Delivery: A Handover Checklist for the Project Site
A checklist for contractors and project owners when a pontoon delivery arrives: match the documents, check the shell and shape, count components, store correctly and document everything.